FERC Security Plan Requirements (Chapter 7)
A module-by-module review of Chapter 7 of the FERC Security Program for Hydropower Projects — covering what a Security Plan must contain, how it must be maintained, emergency response coordination, rapid recovery planning, and documentation requirements.
Module 1: What Is a Security Plan?
Section 7.1 of the FERC Security Program defines the Security Plan as the foundational operating document for all security activity at a licensed hydropower facility.
- A Security Plan (SP) is a formal document — or organized set of documents — that constitutes the Standard Operating Procedures for all security concerns at the dam and project.
- The SP covers physical security, cybersecurity, and procedural security in a single comprehensive framework.
- The plan may be one document or a collection of individual plans that together address all aspects of security management at the facility.
- The SP must be comprehensive enough to be used by both security personnel and dam operators — operators are often the "eyes and ears" of security and must be able to initiate responses.
- Licensees may cross-reference other internal documents rather than duplicating content, as long as the indexing between plans is straightforward.
- The Security Plan is distinct from the Emergency Action Plan (EAP) — the EAP addresses dam safety emergencies (natural or sabotage-related), while the SP governs security protocols and procedures.
- Security Plans are required for Security Group 1 and Security Group 2 dams, and are strongly recommended for Security Group 3 dams.
Module 2: Security Plan Contents and Required Elements
Section 7.2 defines both required and recommended contents of the Security Plan. Required topics are those FERC will specifically review during Dam Safety Inspections.
| Security Plan Section | Required? | Notes |
|---|---|---|
| Lists of Restricted Areas | Recommended | Identifies areas where access must be controlled |
| Lists of Critical Physical Dam-related Assets | Recommended | Dam structures, appurtenant structures, and key components |
| Physical Security Description / Layout / Inventory | Recommended | Fences, cameras, lighting, intrusion detection — what exists and where |
| Security Operational Procedures | Required | Employee duties, security education, document control |
| Procedures to Address Site Access | Recommended | Both employees and visitors; escorted access requirements |
| Key Control Procedures | Required | Who holds keys, issuance tracking, retrieval upon separation |
| Procedures for Civil Disturbance | Recommended | Coordination with on-site protests, crowd management |
| Response to Bomb Threats | Recommended | Step-by-step response protocol |
| Procedures for Temporary Project Closure | Recommended | When and how to close the facility |
| Threat Level Contingency Planning | Required | Pre-planned actions to rapidly adjust security posture to current threat level |
| Communication Procedures and Redundancies | Required | Primary and backup communication methods during a security event |
| Information Technology / SCADA | Required (if applicable) | Cyber and control system security procedures; required for any facility with cyber assets |
| Security Maintenance, Testing, and Resources | Recommended | O&M schedules for security equipment, testing logs, resource planning |
| Internal Emergency Response and Rapid Recovery | Required (SG1 & SG2) | Coordination between security response and emergency management; see Sections 7.4.1 and 7.4.2 |
| Upgrades and Additions to Security Procedures | Required | Documents all planned and completed security improvements with schedules |
Module 3: Security Plan Implementation Requirements
Section 7.3 specifies where the SP must be maintained, who may access it, how it must be kept current, and when it must be exercised.
- The Security Plan must be available on-site at each dam for all Security Group 1 and 2 facilities — in hard copy or secured electronic form.
- Exception for un-staffed dams: if a dam has no on-site staff (operated remotely from a control center), the SP may be retained at the control center where roving operators work.
- Dam owners may share the SP with outside agencies that have a documented "need-to-know," but hard copies must never be provided to or retained by any outside agency or non-owner.
- The SP documents security hardware, operational procedures, personnel roles and responsibilities, and pre-planned responses to changing threat conditions.
- A separate Security Plan must be developed for each individual dam — one plan does not cover multiple sites.
- Any recommendations from a completed Vulnerability Assessment (VA) or Security Assessment (SA) that have been implemented must be fully incorporated into the Security Plan.
- The SP must be updated continuously as site changes occur — it must never be allowed to become outdated.
- Security Group 1 SPs must be exercised (tested) at least every five years — at the drill level or higher — to verify that security and operational employees know its contents.
- SP exercises for Group 1 may be combined with the regular Dam Safety Exercise program or consolidated across multiple projects in the same watershed.
- Security Group 2 SP exercises are not required but are strongly encouraged.
Module 4: Internal Emergency Response (Section 7.4.1)
Section 7.4.1 addresses one of the most commonly deficient areas in dam security programs: the coordinated notification and hand-off between a detected security incident, law enforcement, and emergency management.
- When a serious security incident is detected, two simultaneous notifications must occur: (a) law enforcement to respond to/stop the adversary, and (b) Emergency Management Agencies (EMA) to protect downstream public life and property.
- These two actions must be pre-planned — law enforcement and emergency management have separate goals, and coordination failures at the worst moment are preventable through good planning.
- The Emergency Action Plan (EAP) governs dam safety emergencies; the Security Plan governs the security response. The two must be coordinated — but security protocol details must not be placed in the EAP, which has wider distribution.
- The Internal Emergency Response sub-element of the SP documents the transition from security concern to EAP implementation — this transition must be seamless.
- If the licensee has a dedicated security officer, that person must review the EAP and resolve any conflicts between security protocols and emergency response procedures before an incident occurs.
- Security personnel must be trained on EAP procedures; EAP coordinators must understand when security concerns trigger EAP actions.
- The Internal Emergency Response sub-element of the SP is required for all Security Group 1 and Security Group 2 dams.
- This sub-element must be updated annually with the SP — especially all contact information for law enforcement agencies.
- The SP should be reviewed with COOP (Continuity of Operations) Plans and other company documents to ensure internal consistency and no procedural conflicts.
Module 5: Rapid Recovery of Essential Services (Section 7.4.2)
Section 7.4.2 requires Security Group 1 dams to document specific pre-planned actions for restoring dam operations quickly after a security incident or disaster, minimizing the impact of service interruption.
- The Rapid Recovery of Essential Services sub-element is required only for Security Group 1 dams — SP exercising for Group 2 is strongly encouraged but not mandated for this element.
- Compliance with NERC CIP-009-1 satisfies the cyber asset recovery requirements — licensees subject to CIP-009-1 need only include a footnote in the SP indicating that compliance.
- An adversary may deliberately target power generation or water supply — rapid restoration of these services reduces the overall consequence of an attack and therefore reduces Security Risk.
- The Rapid Recovery sub-element documents pre-planned actions for a utility to continue, or quickly restore, power generation or facility function after natural or criminal disruption.
- This sub-element differs from company-level recovery plans (COOP, Utility Recovery Plan) — it focuses on restoring a specific facility, not the enterprise.
- Key content includes: stockpiles of critical materials, location of heavy equipment, warehousing of critical spare parts, and contacts for contractors and vendors.
- Interruptions to transmission lines and switchyards must also be addressed in the Rapid Recovery plan.
- The DHS publication "Dams Sector Crisis Management Handbook" (2008) provides a suggested format and is available online.
- Suggested content for the Rapid Recovery sub-element includes: applicable emergency scenarios, Incident Command System assignments, coordination with local authorities, communications and maps, vehicles/equipment/contractors, response time and geographic limitations, and meals/lodging for extended events.
Module 6: Security Plan Documentation and Compliance
Section 7.5 defines how Security Plans must be documented, maintained, and certified. FERC does not receive the SP directly — compliance is verified during Dam Safety Inspections and through an annual certification letter.
- All plans, procedures, and hardware relevant to on-site security must be fully documented within the SP.
- Security Plans for Group 1 and 2 dams were first required by December 31, 2010.
- Each SP must be updated annually — changes to parameters, hardware, and procedures must be highlighted from the previous year.
- Changes may be inserted as attachments or replacement sections; any on-site modification to security systems or procedures must be reflected in the SP.
- If there were no changes in the prior year, an acceptable update is a one-page dated insert stating "reviewed the SP and there are no changes."
- Licensees do not submit their Security Plan to FERC — but the SP must be made available for review during every Dam Safety Inspection without exception.
- In place of direct submission, licensees must submit an Annual Security Compliance Certification Letter to their FERC Regional Office by December 31 of each year.
- The annual letter must certify compliance with SP requirements, confirm that the Internal Emergency Response sub-element has been updated (including all law enforcement contact information), and report the last date of SP exercise for Group 1 dams.
- For licensees with multiple dams, a single annual letter may cover all VA, SA, and SP compliance certifications across the portfolio.